O que é uma calculadora de ponto de reabastecimento?
A reorder point calculator estimates when to review a new purchase order using average daily demand, replenishment lead time and safety stock. It answers when to order; an EOQ or replenishment quantity calculation answers how much. Use consistent units and review the assumptions whenever demand or supplier performance changes.
Reviewed
Reorder point example: check inventory position before ordering
At 20 units per day, seven days of lead time and 40 buffer units, the reorder point is 20 × 7 + 40 = 180 units. This illustrative calculation assumes a consistent planning period and unit of measure.
If on-hand stock is 150, an open supplier order is 80 and unfulfilled commitments are 20, inventory position is 150 + 80 − 20 = 210 units. It exceeds the 180-unit trigger, even though shelf stock alone is lower. Check that the open order will arrive in time; a late order can still leave a shortage.
When should I recalculate my reorder level?
Review after supplier delays, promotions, stockouts or a change in sales mix. Sales recorded during a stockout may understate demand. For weekly ordering, include the review interval in your planning; this continuous-review formula alone does not cover it.
Inventory statistics: context for your stock decisions
The US Census Bureau reported $2,818.8 billion in seasonally adjusted manufacturing and trade inventories for August 2026, up 0.4% from July. The total business inventories-to-sales ratio was 1.33, compared with 1.40 in August 2025.
These are US economy-wide estimates released on 15 October 2026, not small-business targets or results achieved with My Inventory Items. The ratio compares end-of-month inventory with monthly sales; it is different from inventory turnover calculated using cost of goods sold. A national ratio cannot tell you how many units of a particular SKU to order.
Source: US Census Bureau, August 2026 Manufacturing and Trade Inventories and Sales · Checked .
For your own replenishment plan, measure daily demand, actual supplier lead time and available stock by SKU. Compare the buffer with cash, shelf life and storage constraints.
Work through a replenishment analysis · Browse dated inventory research and source context
Como encontrar seu ponto de reabastecimento em 3 etapas
Etapa 1 – Insira a média de vendas diárias
Quantas unidades deste produto você vende em média por dia? Se você vende 30 unidades por semana, suas vendas diárias = 30 ÷ 7 ≈ 4,3 unidades/dia.
Passo 2 — Insira o prazo de entrega
O lead time é o número de dias que leva desde a colocação de um pedido de compra ao fornecedor até o recebimento do estoque em sua loja ou depósito.
Passo 3 — Definir estoque de segurança (opcional)
Safety stock is a buffer for demand or delivery variation. A zero buffer assumes no extra protection; review actual variation and the impact of shortages before choosing it.
Quem usa esta calculadora de pontos de reabastecimento?
Proprietários de lojas de varejo
Estimate reorder triggers for each product and review them when seasonal demand or delivery times change.
Gerentes de armazém e loja
Defina alertas de novos pedidos em seu sistema de estoque no ROP calculado para cada SKU.
Proprietários de farmácias
Mantenha os medicamentos essenciais em estoque calculando os pontos de novo pedido com base nas taxas de prescrição e nos prazos de entrega do fornecedor.
Vendedores de comércio eletrônico
Evite listagens fora de estoque que prejudicam as classificações de pesquisa e as vendas, fazendo pedidos no momento certo.
Perguntas frequentes
O que é um ponto de reabastecimento?
A reorder point (ROP) is a replenishment trigger: average daily demand × lead time + safety stock. Under continuous review, compare the trigger with inventory position (on-hand + on-order − backorders or committed demand, counted once) to avoid duplicate orders. It does not guarantee stock availability.
Como você calcula o ponto de novo pedido?
Use a fórmula do ponto de reabastecimento: ROP = (Vendas médias diárias × Prazo de entrega em dias) + Estoque de segurança. Exemplo: você vende 20 unidades por dia, seu fornecedor demora 7 dias para entregar e você mantém 40 unidades em estoque de segurança. ROP = (20 × 7) + 40 = 180 unidades, portanto faça um novo pedido assim que o estoque cair para 180.
Como você calcula o estoque de segurança para o ponto de reabastecimento?
Um método comum é Estoque de segurança = (Vendas diárias máximas × Prazo de entrega máximo) - (Vendas médias diárias × Prazo de entrega médio). Se você vende no máximo 30 unidades por dia, a entrega mais longa demora 10 dias, e em média você vende 20 por dia com lead time de 7 dias, estoque de segurança = 300 − 140 = 160 unidades.
O que é estoque de segurança?
Safety stock is extra inventory held for demand or delivery variation. Size it using your SKU history, desired service level, supplier reliability and holding constraints. A fixed number of weeks is not a universal recommendation.
Como calculo as vendas médias diárias?
Some o total de unidades vendidas em um período (por exemplo, 30 dias) e divida pelo número de dias. Exemplo: 900 unidades vendidas em 30 dias = média de 30 unidades/dia.
Qual é o prazo de entrega no estoque?
O lead time é o tempo total desde a colocação de um pedido de compra até o recebimento da mercadoria. Inclui o tempo de processamento do fornecedor, produção (se aplicável), remessa e qualquer desembaraço aduaneiro.
O que acontece se eu for abaixo do ponto de reabastecimento sem fazer o pedido?
Você corre o risco de uma ruptura de estoque – ficar totalmente sem estoque. Isso leva à perda de vendas, clientes insatisfeitos e possíveis danos à reputação da sua empresa.
Esta calculadora de ponto de reabastecimento é gratuita?
Sim, totalmente gratuito. Não é necessário login ou conta.